Home Up Feedback

 

Master Plan Study


 

 

Home
Up

 

  •   Site Evaluation - An on-site inspection is done in order to evaluate existing site conditions (terrain, drainage, sol types and vegetation).  This enables Greg Nash Design to determine the type and character of golf course that is most suited to the location.

 

  •   Routing Plan - During the phase, Greg Nash Design evaluates the gathered site information and blends it with the owner's requests and the project master-plan requirements to prepare a series of preliminary sketches that show how the golf course will interact with the overall development.  Once a final routing plan is approved, Greg Nash Design prepares a color rendering of the routing plan, and a preliminary golf course construction schedule.  All of these are then submitted for the owner's review.

 

  •   Water-Usage Study - Greg Nash Design also prepares a water-usage study which details the sprinkler head layout, the various type of areas to be irrigated and the amount of water each will require during peak, off peak and annual use periods.  A report of this study is then submitted to the owner and any appropriate local or state agencies for review.


Information Request Form

Select the items that apply, and then let us know how to contact you.

Send service literature
Send company literature
Have a salesperson contact me

Name
Title
Company
Address
E-mail
Phone

 

Send mail to webmaster@gregnashdesign.com with questions or comments about this web site.
Copyright © 2006 Greg Nash Design
Last modified: 10/03/06